I arrived at the Nelson Electric Tramway Society Museum just before the start of streetcar operations for the day. Here, Streetcar #: 23 peaks out of the barn doors as it is inspected prior to running. In the cab, you can see, "Jean", one member of a crew of two that operates the streetcar. In a little bit, she will give me a shout and I will board for the first trip of the day. The trip is approximately 3/4's of a mile long and has a loop at both ends to allow continuous running.

Pre-Run Streetcar Inspection.

1395 wyświetlenia
0

I arrived at the Nelson Electric Tramway Society Museum just before the start of streetcar operations for the day. Here, Streetcar #: 23 peaks out of the barn doors as it is inspected prior to running. In the cab, you can see, "Jean", one member of a crew of two that operates the streetcar. In a little bit, she will give me a shout and I will board for the first trip of the day. The trip is approximately 3/4's of a mile long and has a loop at both ends to allow continuous running.

Dodano do Streetcars and Trolleys. i przypisano do kategorii 1 rok temu

https://www.facebook.com/groups/481968812248343/

W tym albumie