These two units will be crossing Overpeck Creek for the fourth time as they shove a cut of gondola cars loaded with construction debris south into the CSX portion of Little Ferry Yard. The light units crossed, the first time, heading north. Then, they shoved south bound over the bridge, in the background on the right, into the NYS&W portion of the yard. They came back north, on that same bridge on the right, with the loaded gons. Now, they are headed back south on the CSX main.

Shoving Over the Creek.

1566 προβολές
0

These two units will be crossing Overpeck Creek for the fourth time as they shove a cut of gondola cars loaded with construction debris south into the CSX portion of Little Ferry Yard. The light units crossed, the first time, heading north. Then, they shoved south bound over the bridge, in the background on the right, into the NYS&W portion of the yard. They came back north, on that same bridge on the right, with the loaded gons. Now, they are headed back south on the CSX main.

Προστέθηκε στο Railfanning New Jersey. και κατηγοριοποιήθηκε στην Πριν από 1 έτος

https://www.facebook.com/groups/481968812248343/

Μέσα στο άλμπουμ