About mid-way up the Hook, YPBA-27 swaps the empties with the inbound loads that it will take into Gordon Terminals. It has now left the empties on the track to the right and is now coupling up to the inbound loads on 03.02.26.

Mid-Hook Swap.

47 просмотра
0

About mid-way up the Hook, YPBA-27 swaps the empties with the inbound loads that it will take into Gordon Terminals. It has now left the empties on the track to the right and is now coupling up to the inbound loads on 03.02.26.

Добавлено к Conrail Bayonne. в категорию 1 день назад

https://www.facebook.com/groups/481968812248343/

В этом альбоме