I had some good luck as I detoured down the Hook Road on 01.05.26. I only expected to see the EJRR but Conrail arrived as I was waiting. Here, Conrail local YPBA-27 has just cut off the tank cars that were in front of the unit and the crew gets back on board as they prepare to switch out Gordon Terminal. In the background, EJRR #: 321B scoots away as it heads back up north to the Main Terminal. It was nice to catch both railroads working as they usually keep their operation separate, so as not to interfere with each other in the tight confines of the Chem South area.

Both Hook Road Railroads at Work.

10 จำนวนคนดู
0

I had some good luck as I detoured down the Hook Road on 01.05.26. I only expected to see the EJRR but Conrail arrived as I was waiting. Here, Conrail local YPBA-27 has just cut off the tank cars that were in front of the unit and the crew gets back on board as they prepare to switch out Gordon Terminal. In the background, EJRR #: 321B scoots away as it heads back up north to the Main Terminal. It was nice to catch both railroads working as they usually keep their operation separate, so as not to interfere with each other in the tight confines of the Chem South area.

เพิ่มไปยัง Conrail Bayonne. และจัดหมวดหมู่เป็น 8 ชั่วโมง ก่อนหน้านี้

https://www.facebook.com/groups/481968812248343/

ในอัลบั้มนี้